![]() ![]() ![]() The trainings are free, but registration is required. Form CI-X, Critical Designation Exception Application, and its attachment would be submitted by an operator certifying a facility seeks an exception to critical designation because the facility is not prepared to operate in a weather emergency.Form CI-D, Acknowledgement of Critical Customer/Critical Gas Supplier Designation, and its attachment would be submitted by an operator of a facility designated as critical acknowledging the facility’s critical status.These events will train attendees on requirements for new rule 16 Texas Administrative Code (TAC) §3.65, relating to Critical Designation of Natural Gas Infrastructure, including filing two forms. The RRC recently adopted rules and forms for critical designation of natural gas infrastructure during energy emergencies as specified in Senate Bill 3 and House Bill 3648 passed by the 87th Legislature (Regular Session). The Railroad Commission of Texas (RRC) will host three free trainings on New Critical Designation of Natural Gas Infrastructure Rule Requirements in Corpus Christi, Fort Worth and Midland in January 2022. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |